Lännen Tractors

We can operate with the same staff despite growth in production volume and the number of SKUs.

Client: Lännen Tractors Oy
Industry: International supplier of smart, mobile multi-purpose machines
Services: Work Study 360 current-state analysis and Work Study 360 layout design
Results: Receiving process efficiency +28.5%, spare parts picking efficiency +24.6%, kit picking efficiency +16.2%.

“I can warmly recommend Ziirto’s services to all manufacturing companies that want to take intralogistics capacity and throughput to the next level—without forgetting people. Ziirto’s engineers worked in a practical and highly professional way.”

ARTO IIVONEN
Production Director, Lännen Tractors Oy

Starting point

Production from the SkellefteĂĄ factory in Sweden will be transferred to Loimaa during 2023. This means a significant increase in component and spare-part storage at the Loimaa factory. To make the move possible, additional storage capacity and process development were needed. Internal resources were not sufficient, and the company also wanted to benefit from the expertise of an external partner.

What was done

Work Study 360 current-state analysis

Work Study 360 layout design

Our collaboration started with a current-state analysis carried out by Ziirto. This reviewed all warehousing-related processes and existing storage methods. It established accurate baseline data for current operations and enabled successful design of the new layout and processes.

Ziirto designed two new layout options. In the first option, the number of pallet locations increased from 1,999 pallets to 2,595 pallets. This option also considered a potential box automation solution. In the second option, pallet locations could be increased to 3,196 pallets. Both options included two Kasten paternosters.

Outcome

Receiving process efficiency +28.5%, spare parts picking efficiency +24.6%, kit picking efficiency +16.2%. Thanks to the process improvements, the same staff will be able to handle the storage of components and spare parts for the machines transferred from SkellefteĂĄ, Sweden.

During the project, processes and methods were developed to improve throughput. We are able to operate with the same staff despite growth in production volume and the number of SKUs. All new items could be stored thanks to the layout designed for us. Ziirto also produced detailed payback calculations during the project for an automated storage system investment. Based on their calculations, it was safe and justified for us to invest in a new automated storage solution that improves space utilization and processes.

Lännen Tractors Oy

Building a better world with fewer machines

A clean, safe and functional environment is the foundation of our well-being. We all share responsibility for it. That is why limited resources should be allocated as wisely as possible. Responsible operations and smart solutions help increase efficiency without compromising our duty to the environment.

We deliver high-quality equipment whose mobility and versatility make it possible to achieve more with fewer machines and lower costs.

https://www.lannen.com/fi/

For more information about the Work Study 360™ service:
Toni Salminen
Development Engineer, Partner